Saraighat Bridge To Be Shut Again

Saraighat Bridge To Be Shut Again

It is not even a month that the Saraighat Bridge had been reopened after was being revamped that it will again be shut for another few days.

According to reports, this bridge, which connects the north and south bank of the Brahmaputra River, will be closed again for application of a mastic layer on it.

It has been informed that the process usually takes 10-15 days.

The move came after a discussion of the Northeast Frontier Railway with the Assam Government.

What is mastic layer?

The Mastic layer is an asphalt layer to increase the endurance of dynamic stresses that occur on bridges. It ensures the necessary stableness of the bridge providing permanent waterproofing and a long life. The layer is used on steel bridges, concrete bridges and wooden bridges.

Md Elias Ali

I am **Md Elias Ali**, the **Managing Editor & Co-Founder of Guwahati Times**, a leading digital news platform based in Guwahati, Assam. With over **five years of experience in the media and digital news industry**, I specialize in editorial leadership, digital journalism, content strategy, and newsroom management. Beyond journalism, I am a **technologist, social media strategist, graphic designer, educator, and author**. I am passionate about leveraging technology and creativity to drive digital innovation, build impactful media brands, and deliver credible, engaging content to audiences across Northeast India and beyond.