31 C
Assam
Wednesday, September 28, 2022

Featured News

Repair work of Old- Saraighat Bridge under full swing

English NewsRepair work of Old- Saraighat Bridge under full swing

Repair work underway at Old Saraighat Bridge
A statement released by the Northeast Frontier Railway said the repair will be done in the road deck portion. It said there is no danger to the bridge as highlighted by a section of the media in the last few days.

“NF Railway would like to categorically state that there is no danger to the bridge and is planning to carry out a massive repair of the road deck portion in the next few days,” the statement said.

“The work will be done round-the-clock. As many as 80 identified deck slabs of Saraighat bridge are going to be replaced.

News Desk Report-GT

Check out our other content

Check out other tags:

Most Popular Articles

error: Content is protected !!
%d bloggers like this: